Backyard Swim Ponds · Gravel preparation · Part 1 of 3
Swimming pond gravel preparation worksheet
1. Agree the material before ordering
Use one record for one material, layer or delivery lot. The designer supplies the acceptance requirements; the supplier documents the offered material. Leave an unresolved item open before ordering.
Identity and intended job
Project / location / country
Prepared by / date / drawing revision
Material role and exact zone or layer on the drawing
Supplier / product / quarry or other source reference
Specification and supporting evidence
Ask what the size label and “washed” description mean for this order. Record the agreed requirements and evidence rather than filling in limits from a different pond.
Required grading / units / supplier grading report reference
Allowed fines / assessment method / person setting the requirement
Composition or nutrient-release evidence required by designer / report and sample reference
Layer dimensions / quantity / units / quantity calculation reference
Compatibility: liner protection, distribution openings, supports and planting / accepted detail reference
Who accepts the specification / decision date / unresolved questions
Backyard Swim Ponds · Gravel preparation · Part 2 of 3
2. Check the sample and the delivery
Keep the order, sample record and delivery ticket together. A photograph or settled-water observation records appearance; it does not establish chemistry, treatment performance or swimming-water safety.
Sample and delivery match
Sample ID / source / date / how selected
Delivery date / ticket / lot or load reference
Observed dust, loose sediment, debris or difference from sample / photo reference
Checks required by specification / results / reviewer
Decision: accept / hold / return / prepare as agreed — who decided and why?
Preparation, only when required
Agree the method before starting. Extra rinsing is not an automatic remedy for the wrong material. Do not substitute a visual rinse result for the acceptance requirements on part 1.
Preparation required? Yes / no / unresolved — instruction reference and decision-maker
Agreed method / people and equipment / responsible person
Work area / separate storage / route to the bed / protection of finished work
Water supply and expected amount, if used / units / basis of estimate
Wash-water and sediment collection / destination / local permission or acceptance reference
Resolve the dirty-water route before washing. Do not assume a drain, ditch, soil area or the pond is an acceptable outlet. Ask the responsible contractor to check the applicable local requirements.
Backyard Swim Ponds · Gravel preparation · Part 3 of 3
3. Record effort and access before closing the job
If preparation is required, a small agreed work batch can help you estimate the remaining handling. Record the conditions; one batch is a planning observation, not a guaranteed production rate.
Handling and preparation allowance
Batch amount and units / date / method used
People involved / elapsed time / total person-hours
Time included: setup / moving / preparation / clean-up — specify
Water used, if measured / units; otherwise mark estimate or unknown
Remaining quantity / expected hours and basis / equipment or waste costs and currency
Access, weather, storage or delivery constraints that may change the allowance
Placement and future maintenance
Confirm the specified liner protection and service openings before covering work. Keep covers reachable and a route for future tools, removed material and replacement components.
Installed zone / quantity / drawing and photo references / accepted deviations
Service opening and working space / hose or tool route / planting clearance checked by
Cleaning method and trigger from system instructions / removed-water and sediment route
Outstanding issue / named person / next action / date; who accepted placement?