Swimming pond gravel preparation worksheet

1. Agree the material before ordering

Use one record for one material, layer or delivery lot. The designer supplies the acceptance requirements; the supplier documents the offered material. Leave an unresolved item open before ordering.

Identity and intended job

Project / location / country

Prepared by / date / drawing revision

Material role and exact zone or layer on the drawing

Supplier / product / quarry or other source reference

Specification and supporting evidence

Ask what the size label and “washed” description mean for this order. Record the agreed requirements and evidence rather than filling in limits from a different pond.

Required grading / units / supplier grading report reference

Allowed fines / assessment method / person setting the requirement

Composition or nutrient-release evidence required by designer / report and sample reference

Layer dimensions / quantity / units / quantity calculation reference

Compatibility: liner protection, distribution openings, supports and planting / accepted detail reference

Who accepts the specification / decision date / unresolved questions

Backyard Swim Ponds · Version 2026-09-18 · Questions for your project

Keep this part with the material specification, the other parts and supporting records.

Backyard Swim Ponds · Gravel preparation · Part 2 of 3

2. Check the sample and the delivery

Keep the order, sample record and delivery ticket together. A photograph or settled-water observation records appearance; it does not establish chemistry, treatment performance or swimming-water safety.

Sample and delivery match

Sample ID / source / date / how selected

Delivery date / ticket / lot or load reference

Observed dust, loose sediment, debris or difference from sample / photo reference

Checks required by specification / results / reviewer

Decision: accept / hold / return / prepare as agreed — who decided and why?

Preparation, only when required

Agree the method before starting. Extra rinsing is not an automatic remedy for the wrong material. Do not substitute a visual rinse result for the acceptance requirements on part 1.

Preparation required? Yes / no / unresolved — instruction reference and decision-maker

Agreed method / people and equipment / responsible person

Work area / separate storage / route to the bed / protection of finished work

Water supply and expected amount, if used / units / basis of estimate

Wash-water and sediment collection / destination / local permission or acceptance reference

Resolve the dirty-water route before washing. Do not assume a drain, ditch, soil area or the pond is an acceptable outlet. Ask the responsible contractor to check the applicable local requirements.

Backyard Swim Ponds · Version 2026-09-18 · Questions for your project

Keep this part with the material specification, the other parts and supporting records.

Backyard Swim Ponds · Gravel preparation · Part 3 of 3

3. Record effort and access before closing the job

If preparation is required, a small agreed work batch can help you estimate the remaining handling. Record the conditions; one batch is a planning observation, not a guaranteed production rate.

Handling and preparation allowance

Batch amount and units / date / method used

People involved / elapsed time / total person-hours

Time included: setup / moving / preparation / clean-up — specify

Water used, if measured / units; otherwise mark estimate or unknown

Remaining quantity / expected hours and basis / equipment or waste costs and currency

Access, weather, storage or delivery constraints that may change the allowance

Placement and future maintenance

Confirm the specified liner protection and service openings before covering work. Keep covers reachable and a route for future tools, removed material and replacement components.

Installed zone / quantity / drawing and photo references / accepted deviations

Service opening and working space / hose or tool route / planting clearance checked by

Cleaning method and trigger from system instructions / removed-water and sediment route

Outstanding issue / named person / next action / date; who accepted placement?