Backyard Swim Ponds · Pump selection · Part 1 of 3
Swimming pond pump selection brief
1. The system the pump must serve
Complete one brief for one proposed pump and operating condition. Ask the designer to supply the required duty, then ask the supplier to document how the exact regional model meets it. Keep separate copies for alternatives or different operating modes.
Project and responsibility
Project / location / country
Prepared by / date / revision
Designer responsible for treatment and hydraulic duty
Intended use: private / rental / public / other — describe
Designer-supplied duty
Record flow and total head together, with the calculation reference. Leave unknowns open for the designer; this sheet does not size a pump. State whether any gallons are US or Imperial. Maximum flow and maximum head on a product page are not one operating point.
Circuit purpose and treatment components served
Operating mode and other branches running at the same time
Required design flow — value and units
Total head at that flow — value and units
Permitted flow range and location where flow must be checked
Hydraulic calculation / designer / date; clean or loaded filter condition
Layout used for that calculation
Attach a measured layout showing water levels, pipe internal diameters and lengths, fittings, valves, treatment components and the proposed pump position. Ask the designer which losses are included; pond depth alone is not the total head.
Drawing / calculation reference and revision
Layout changes still awaiting assessment
Sketch or attachment reference: route, levels and service access
Backyard Swim Ponds · Pump selection · Part 2 of 3
2. The exact pump and installation
Use the manual and curve for the offered model, regional electrical version and control setting. A similar model name, “pond safe” description or low-voltage label does not answer all of these questions.
Identity and permitted application
Manufacturer / complete model / regional product code
Supplier quote reference / date / exact bundle contents
Site mains supply and offered primary supply rating: V / Hz / phase
Pump-side supply: V / AC or DC; power-supply model if separate
Explicit swimming-pond use: manual title / revision / page or written manufacturer confirmation
Conditions or exclusions for this intended use; unresolved differences between documents
Installation, controls and curve
Attach the marked curve and applicable manual pages. “External installation” does not mean a pump may run without water. Have the installer resolve supply placement, protective arrangements and intake design for this project; this sheet gives no wiring or installation recipe.
Proposed position: submerged or external; water-level relationship and manual reference
Controller model / included or separate / selected speed or operating mode
Exact flow–head curve reference / date / regional model / speed
Supplier-marked duty point: flow + head + setting; acceptable operating range
Professional responsible for electrical arrangement and intake protection
Access for inspection, removal and cleaning; local service / spares source
Before accepting the offer
Missing components, contradictory specifications or conditions still needing written confirmation
Backyard Swim Ponds · Pump selection · Part 3 of 3
3. Electricity, handover and open questions
Compare alternatives at equivalent treatment duty and an agreed operating schedule. Keep forecast figures separate from commissioning readings. Repeat this part for each distinct load or operating period, avoiding double counting.
What does the watt figure measure?
Electricity calculations need electrical input at the supply. Motor shaft output is a different quantity; a nameplate maximum or power-supply capacity is not automatically consumption at the selected duty. Identify what the figure includes, including power supply and controls.
Nameplate / published power figure and its meaning: input, output, maximum or other
Electrical input at the stated duty — W; source / date; forecast or measured
Measurement or estimate boundary: pump, power supply, controls; any loads excluded
Operating-period estimate
For constant input during a period: kWh = electrical input W ÷ 1,000 × operating hours. Energy charge = kWh × tariff per kWh. Calculate different settings or periods separately and add them. This is the energy charge only; record any other charges separately. Keep the treatment schedule agreed by the designer.
Period / mode; hours per day × number of days = total operating hours
Tariff per kWh / currency / tax basis / price date
Calculated kWh and energy charge for this period
Extra loads or charges / unknown inputs / calculation reference
Commissioning record — complete after installation
Keep the readings with the installed layout, settings, manuals, cleaning instructions and fault contact. Ask the responsible designer to review any difference from the agreed duty.
Date / person / measured flow / location / units / control setting
Measured electrical input W / measurement boundary / operating conditions
Questions the supplier or designer still needs to answer
Question / responsible person / written answer reference / due date
Question / responsible person / written answer reference / due date