# Swimming pond pump selection brief

Backyard Swim Ponds · Version 2026-09-18

A blank discussion brief, not an engineering specification or installation approval. Complete one copy per proposed pump and operating condition. Unknown inputs stay unknown; do not substitute a product maximum.

This editable Markdown alternative contains the same prompts as the print worksheet. Keep completed copies privately; it has no submission or storage service.

## 1. The system the pump must serve

Complete one brief for one proposed pump and operating condition. Ask the designer to supply the required duty, then ask the supplier to document how the exact regional model meets it. Keep separate copies for alternatives or different operating modes.

### Project and responsibility

- **Project / location / country:**

  ____________________________________________________________

- **Prepared by / date / revision:**

  ____________________________________________________________

- **Designer responsible for treatment and hydraulic duty:**

  ____________________________________________________________

- **Intended use: private / rental / public / other — describe:**

  ____________________________________________________________

### Designer-supplied duty

Record flow and total head together, with the calculation reference. Leave unknowns open for the designer; this sheet does not size a pump. State whether any gallons are US or Imperial. Maximum flow and maximum head on a product page are not one operating point.

- **Circuit purpose and treatment components served:**

  ____________________________________________________________

- **Operating mode and other branches running at the same time:**

  ____________________________________________________________

- **Required design flow — value and units:**

  ____________________________________________________________

- **Total head at that flow — value and units:**

  ____________________________________________________________

- **Permitted flow range and location where flow must be checked:**

  ____________________________________________________________

- **Hydraulic calculation / designer / date; clean or loaded filter condition:**

  ____________________________________________________________

### Layout used for that calculation

Attach a measured layout showing water levels, pipe internal diameters and lengths, fittings, valves, treatment components and the proposed pump position. Ask the designer which losses are included; pond depth alone is not the total head.

- **Drawing / calculation reference and revision:**

  ____________________________________________________________

- **Layout changes still awaiting assessment:**

  ____________________________________________________________

- **Sketch or attachment reference: route, levels and service access:**

  ____________________________________________________________

## 2. The exact pump and installation

Use the manual and curve for the offered model, regional electrical version and control setting. A similar model name, “pond safe” description or low-voltage label does not answer all of these questions.

### Identity and permitted application

- **Manufacturer / complete model / regional product code:**

  ____________________________________________________________

- **Supplier quote reference / date / exact bundle contents:**

  ____________________________________________________________

- **Site mains supply and offered primary supply rating: V / Hz / phase:**

  ____________________________________________________________

- **Pump-side supply: V / AC or DC; power-supply model if separate:**

  ____________________________________________________________

- **Explicit swimming-pond use: manual title / revision / page or written manufacturer confirmation:**

  ____________________________________________________________

- **Conditions or exclusions for this intended use; unresolved differences between documents:**

  ____________________________________________________________

### Installation, controls and curve

Attach the marked curve and applicable manual pages. “External installation” does not mean a pump may run without water. Have the installer resolve supply placement, protective arrangements and intake design for this project; this sheet gives no wiring or installation recipe.

- **Proposed position: submerged or external; water-level relationship and manual reference:**

  ____________________________________________________________

- **Controller model / included or separate / selected speed or operating mode:**

  ____________________________________________________________

- **Exact flow–head curve reference / date / regional model / speed:**

  ____________________________________________________________

- **Supplier-marked duty point: flow + head + setting; acceptable operating range:**

  ____________________________________________________________

- **Professional responsible for electrical arrangement and intake protection:**

  ____________________________________________________________

- **Access for inspection, removal and cleaning; local service / spares source:**

  ____________________________________________________________

### Before accepting the offer

- **Missing components, contradictory specifications or conditions still needing written confirmation:**

  ____________________________________________________________

## 3. Electricity, handover and open questions

Compare alternatives at equivalent treatment duty and an agreed operating schedule. Keep forecast figures separate from commissioning readings. Repeat this part for each distinct load or operating period, avoiding double counting.

### What does the watt figure measure?

Electricity calculations need electrical input at the supply. Motor shaft output is a different quantity; a nameplate maximum or power-supply capacity is not automatically consumption at the selected duty. Identify what the figure includes, including power supply and controls.

- **Nameplate / published power figure and its meaning: input, output, maximum or other:**

  ____________________________________________________________

- **Electrical input at the stated duty — W; source / date; forecast or measured:**

  ____________________________________________________________

- **Measurement or estimate boundary: pump, power supply, controls; any loads excluded:**

  ____________________________________________________________

### Operating-period estimate

For constant input during a period: kWh = electrical input W ÷ 1,000 × operating hours. Energy charge = kWh × tariff per kWh. Calculate different settings or periods separately and add them. This is the energy charge only; record any other charges separately. Keep the treatment schedule agreed by the designer.

- **Period / mode; hours per day × number of days = total operating hours:**

  ____________________________________________________________

- **Tariff per kWh / currency / tax basis / price date:**

  ____________________________________________________________

- **Calculated kWh and energy charge for this period:**

  ____________________________________________________________

- **Extra loads or charges / unknown inputs / calculation reference:**

  ____________________________________________________________

### Commissioning record — complete after installation

Keep the readings with the installed layout, settings, manuals, cleaning instructions and fault contact. Ask the responsible designer to review any difference from the agreed duty.

- **Date / person / measured flow / location / units / control setting:**

  ____________________________________________________________

- **Measured electrical input W / measurement boundary / operating conditions:**

  ____________________________________________________________

### Questions the supplier or designer still needs to answer

- **Question / responsible person / written answer reference / due date:**

  ____________________________________________________________

- **Question / responsible person / written answer reference / due date:**

  ____________________________________________________________

## Related guidance

- [Pump selection guide](/guides/choosing-a-swimming-pond-pump)
- [Filtration guide](/guides/swimming-pond-filtration)
- [Running-cost calculator](/guides/natural-swimming-pond-costs#practical-tool)
- [Pump equipment checklist](/equipment#swim-pond-circulation-pump)

Power terminology: [Grundfos on electrical input and shaft output](https://www.grundfos.com/ca/learn/research-and-insights/induced-power). The pump guide supplies the hydraulic and application sources.
