Backyard Swim Ponds · Five-year budget · Part 1 of 5
Five-year pond
versus pool budget
Compare the same intended swimming area, season, finish and level of service. Record heating, covers and winter arrangements before comparing bills. These are two project options, not a prediction that either will cost less.
Throughout this worksheet, Pond means a biologically treated pond and Pool means a conventionally disinfected pool.
Unknown is not zero. Leave an unpriced amount blank and record what is needed to price it. Write a zero only when no charge is established for that item. Use the same currency and tax basis for both alternatives.
1. Define the comparison
| Item | Pond | Pool |
|---|---|---|
| Country and locality | ||
| Currency | ||
| Tax basis | ||
| Comparison prepared on | ||
| Quote date | ||
| Quote expiry date | ||
| Quote reference | ||
| Drawing revision | ||
| Area units | ||
| Usable swimming area | ||
| Total planted and landscaped footprint | ||
| Swimming season | ||
| Finish | ||
| Level of service | ||
| Heating brief | ||
| Covers | ||
| Winter arrangements | ||
| Price basis across years |
Backyard Swim Ponds · Five-year budget · Part 2 of 5
2. Complete build and handover
Align the whole scope. Mark which allowances are fixed, estimated or dependent on an unresolved condition. Include delivered costs, applicable taxes, duties and freight for imported equipment without counting them twice.
| Item | Pond | Pool |
|---|---|---|
| Design and investigationSurveys, ground investigation, drawings and required approvals. | ||
| Site preparationAccess, excavation, soil handling, disposal and reinstatement. | ||
| Structure and liningShell, protection, liner, penetrations, steps and edges. | ||
| Water systemsFiltration, circulation, controls, plumbing, electrical work and commissioning. | ||
| The garden around itPaths, planting, decks, barriers and agreed lighting. | ||
| HandoverManuals, demonstrations, water-quality arrangements and first-season support. | ||
| Allowances and exclusionsTaxes, provisional sums, unpriced work and requested changes; identify what is already included. | ||
| Complete build cost including handoverCarry this figure into the cash summary once. |
Pond: exclusions, unpriced work and what is needed to price it
Pool: exclusions, unpriced work and what is needed to price it
3. Five-year cash summary
| Item | Pond | Pool |
|---|---|---|
| Completed build and handover | ||
| Year 1 operating cash | ||
| Year 2 operating cash | ||
| Year 3 operating cash | ||
| Year 4 operating cash | ||
| Year 5 operating cash | ||
| Five-year cash total |
Five-year cash total: complete build cost + Year 1 operating cash + Year 2 + Year 3 + Year 4 + Year 5. Enter totals manually after reviewing missing costs; the worksheet contains no formulas or automatic sums.
Keep owner time and money held back as a reserve outside this cash total. These figures include no assumed resale value, property-value gain or investment return.
Backyard Swim Ponds · Five-year budget · Part 3 of 5
4. Annual operating detail
Use the supplier’s maintenance schedule and local service or laboratory prices. For electricity, account for each installed load and its actual schedule; include heating where specified. Record different schedules separately. A chemistry-kit price does not establish the cost of the complete water-quality plan.
Year 1 · operating cash
Year 1 dates / period covered
Year 1 price changes or unchanged-price basis
| Item | Pond | Pool |
|---|---|---|
| Electricity | ||
| Paid cleaning, servicing and seasonal work | ||
| Specified consumables | ||
| Water supply, filling and disposal | ||
| Chemistry monitoring and laboratory work | ||
| Repairs and equipment replacement | ||
| Relevant finance charges | ||
| Additional insurance | ||
| Year 1 operating cash total |
Pond: source references, unknowns or replacement-timing basis
Pool: source references, unknowns or replacement-timing basis
Year 2 · operating cash
Year 2 dates / period covered
Year 2 price changes or unchanged-price basis
| Item | Pond | Pool |
|---|---|---|
| Electricity | ||
| Paid cleaning, servicing and seasonal work | ||
| Specified consumables | ||
| Water supply, filling and disposal | ||
| Chemistry monitoring and laboratory work | ||
| Repairs and equipment replacement | ||
| Relevant finance charges | ||
| Additional insurance | ||
| Year 2 operating cash total |
Pond: source references, unknowns or replacement-timing basis
Pool: source references, unknowns or replacement-timing basis
Do not multiply a cheap first year by five without checking later work. A repair reserve is money held back; an included repair is spending. Count the same money once.
Backyard Swim Ponds · Five-year budget · Part 4 of 5
Annual operating detail · continued
Record the year in which work or replacement is included and the evidence for that timing. If timing is unknown, compare a case with the expense and one without; do not invent a service life.
Year 3 · operating cash
Year 3 dates / period covered
Year 3 price changes or unchanged-price basis
| Item | Pond | Pool |
|---|---|---|
| Electricity | ||
| Paid cleaning, servicing and seasonal work | ||
| Specified consumables | ||
| Water supply, filling and disposal | ||
| Chemistry monitoring and laboratory work | ||
| Repairs and equipment replacement | ||
| Relevant finance charges | ||
| Additional insurance | ||
| Year 3 operating cash total |
Pond: source references, unknowns or replacement-timing basis
Pool: source references, unknowns or replacement-timing basis
Year 4 · operating cash
Year 4 dates / period covered
Year 4 price changes or unchanged-price basis
| Item | Pond | Pool |
|---|---|---|
| Electricity | ||
| Paid cleaning, servicing and seasonal work | ||
| Specified consumables | ||
| Water supply, filling and disposal | ||
| Chemistry monitoring and laboratory work | ||
| Repairs and equipment replacement | ||
| Relevant finance charges | ||
| Additional insurance | ||
| Year 4 operating cash total |
Pond: source references, unknowns or replacement-timing basis
Pool: source references, unknowns or replacement-timing basis
Finance charges and additional insurance are explicit lines, not assumed rates. Record whether the price basis is unchanged or revised for each year.
Backyard Swim Ponds · Five-year budget · Part 5 of 5
Year 5 · operating cash
Year 5 dates / period covered
Year 5 price changes or unchanged-price basis
| Item | Pond | Pool |
|---|---|---|
| Electricity | ||
| Paid cleaning, servicing and seasonal work | ||
| Specified consumables | ||
| Water supply, filling and disposal | ||
| Chemistry monitoring and laboratory work | ||
| Repairs and equipment replacement | ||
| Relevant finance charges | ||
| Additional insurance | ||
| Year 5 operating cash total |
Pond: source references, unknowns or replacement-timing basis
Pool: source references, unknowns or replacement-timing basis
5. Owner time and reserves
Record unpaid hours separately from cash paid. For a separate time-inclusive comparison, you may value those hours using a rate you choose. Keep that optional value outside the cash total.
| Item | Pond | Pool |
|---|---|---|
| Build owner hours | ||
| Year 1 owner hours | ||
| Year 2 owner hours | ||
| Year 3 owner hours | ||
| Year 4 owner hours | ||
| Year 5 owner hours | ||
| Total owner hours |
| Item | Pond | Pool |
|---|---|---|
| Chosen value per owner hourYour chosen currency per hour. | ||
| Optional owner-time valueTotal owner hours multiplied by your chosen value per hour. | ||
| Reserve held backMoney held back, not a second charge for a repair already included. |
Uncertain input to vary / alternative quote or specification
Effect on the comparison and evidence still needed
Show a revised scenario beside the starting case, using actual alternatives from your offers. Keep the original assumptions and avoid filling gaps with a made-up price or lifespan.