BACKYARD SWIM PONDS · PLAN
Print this page or save it as a PDF with your browser’s Print command. Back to the garden suitability guide.
A working brief for a first design conversation. Record observations and open questions; this is not a site survey or an engineering specification.
Laps, occasional dips, time beside the water; intended users; access and supervision needs; things you would find frustrating.
Attach a measured sketch with the proposed water, treatment, dry routes, garden to retain and equipment access. Note the construction route’s narrowest point and obstructions.
Photographs after rain; visible runoff; existing trees; known services; possible water source; uncertainties needing investigation. Do not probe for buried services.
Use one currency and a consistent tax basis. Include design, excavation/disposal, lining, treatment, electrics, surrounding work, handover and reserve. Record annual ownership costs separately.
Owner tasks; professional service; holiday cover; monitoring and sampling plan; fault contact; required records; how the pond returns to use after a problem.
Prepared on: __________________ Site or project: __________________